Working from the client’s basic layout drawings, Viva Engineering developed full 3D models and completed the manufacturing drawings for a scope that included multiple buildings and large platework components. All items were manufactured, hot-dip galvanised and packed into Viva’s specialised skid-loading system before being containerised for transport to the DRC. This approach ensured safe handling, streamlined logistics and efficient site readiness.
Reliable delivery under tight schedules with detailed logistics planning.