Client
Tonnage
800T - Steelwork & Platework
Country
South Africa
Year
2020

About this project

Working with global engineering company KC Cottrell, Viva Engineering delivered the manufacturing drawings and supply of the Boiler Building, the 26 m high stack and multiple large tanks and silos for the SAPPI Ngodwana’s Biomass project.  

Following the successful delivery of the supply scope, Viva was awarded the on-site construction and welding of stainless steel and mild steel tanks. Each tank measured 8 m in diameter and was10 m high, highlighting Viva’s fabrication and on-site capabilities.

Project Highlights

 

  • Fast track delivery of large tanks and complex Boiler building steelwork 
  • Site built and welding of tanks 

Client Benefit

Turnkey project capabilities from shop detailing to site building and welding of tanks.