A project demonstrating the benefits of integrating structural design and shop detailing to save time and eliminate errors. Viva Engineering were responsible for the shop detailing, fabrication, and shipping to the port of Conakry, Guinea
Viva’s scope included 700T steelwork and 300T of platework
Model sharing and integration of with structural design partner Power Consulting resulted in a substantial time saving on the project. It also resulted in a seamless integration from design into shop detailing and fabrication.
Workshop trial assembly of the massive ROM bin resulting in zero site comebacks
Viva’s container “skid loading system” was developed to manage the loading out of 90 containers within an 8 week period and made site unloading safe and easy for site personnel.